1.4 KiB
Prompt
Inspect the TIPC backend rebase onto current main, repair and verify any integration problems before force-push, and prepare the result through the proper /commit-plan workflow.
Response summary
Repaired the stale lock produced by replaying the historical py-multiaddr source-pin commit over current main. Adapted TIPC to the newer lazy-import contract and extended runtime annotation tests for the interim /tipc multiaddr representation. Verified both the full default and TIPC transport test matrices.
Files changed
uv.lock- select the pinned WG-capable py-multiaddr revision while retaining currentmaindependencies.tractor/ipc/_tipc.py- make theMultiaddrannotation import lazy.tests/test_lazy_imports.py- cover TIPC annotation resolution and the interimMultiaddr|strreturn shape.
Human edits
The human restarted and advanced the rebase one conflict at a time, required the agent to provide exact continuation commands after each resolution, authorized lock repair and verification, and retained ownership of the force-push. The human then rejected the ad hoc staging suggestion and required the complete /commit-plan workflow before committing.