The slow (history) chart requires it's own y-range checker logic which
needs to be run in 2 cases:
- the last datum is in view and goes outside the previous mx/mn in view
- the chart is incremented a step
Since we need this duplicate logic this patch also factors the incremental
graphics update info "reading" into a new `DisplayState.incr_info()`
method that can be configured to a chart and input state and returns all
relevant "graphics update measure" in a tuple (for now).
Use this method throughout the rest of the display loop for both fast
and slow chart checks and in the `increment_history_view()` slow chart
task.
Use the new `Feed.get_ds_info()` method in a poll loop to definitively
get the inter-chart sampling info and avoid races with shm buffer
backfilling.
Also, factor the history increment closure-task into
`graphics_update_loop()` which will make it clearer how to factor
all the "should we update" logic into some `DisplayState` API.
Add an update call to the display loop to consistently update the last
datum in the history view chart. Compute the inter-chart sampling ratio
and use it to sync the linear region.
Add a first draft of a working `pyqtgraph.LinearRegionItem` link between
a history view chart (+ data set) and the normal real-time "HFT" chart
set.
Add the history view (aka more downsampled data view) chart set to the
rt/hft set's splitter as it's "first widget". Hook up linear region
callbacks to enable syncing between charts including compenstating for
the downsampling rate ration (in this case hardcoded 60 since 1s to 1M,
but we'll actually compute it going forward obvs).
More to come dawgys..
This was introduced in #302 but after thorough testing was clear to be
not working XD. Adjust the display loop to update the last graphics
segment on both the OHLC and vlm charts (as well as all deriving fsp
flows) whenever the uppx >= 1 and there is no current path append
taking place (since more datums are needed to span an x-pixel in view).
Summary of tweaks:
- move vlm chart update code to be at the end of the cycle routine and
have that block include the tests for a "interpolated last datum in
view" line.
- make `do_append: bool` compare with a floor of the uppx value (i.e.
appends should happen when we're just fractionally over a pixel of
x units).
- never update the "volume" chart.
When using m4, we downsample to the max and min of each
pixel-column's-worth of data thus preserving range / dispersion details
whilst not drawing more graphics then can be displayed by the available
amount of horizontal pixels.
Take and apply this exact same concept to the "last datum" graphics
elements for any `Flow` that is reported as being in a downsampled
state:
- take the xy output from the `Curve.draw_last_datum()`,
- slice out all data that fits in the last pixel's worth of x-range
by using the uppx,
- compute the highest and lowest value from that data,
- draw a singe line segment which spans this yrange thus creating
a simple vertical set of pixels which are "filled in" and show the
entire y-range for the most recent data "contained with that pixel".
The basic logic is now this:
- when zooming out, uppx (units per pixel in x) can be >= 1
- if the uppx is `n` then the next pixel in view becomes occupied by
a new datum-x-coordinate-value when the diff between the last
datum step (since the last such update) is greater then the
current uppx -> `datums_diff >= n`
- if we're less then some constant uppx we just always update (because
it's not costly enough and we're not downsampling.
More or less this just avoids unnecessary real-time updates to flow
graphics until they would actually be noticeable via the next pixel
column on screen.
The most important changes include:
- iterating the new `Flow` type and updating graphics
- adding detailed profiling
- increasing the min uppx before graphics updates are throttled
- including the L1 spread in y-range calcs so that you never have the
bid/ask go "out of view"..
- pass around `Flow`s instead of shms
- drop all the old prototyped downsampling code
Ugh, turns out the wacky `ChartView.maxmin` callback stuff we did (for
determining y-range sizings) currently requires that the volume array
has a "bars in view" result.. so let's make that keep working without
rendering the graphics for the curve (since we're disabling them once
$vlm comes up).
Probably the best place to root the profiler since we can get a better
top down view of bottlenecks in the graphics stack.
More,
- add in draft M4 downsampling code (commented) after getting it mostly
working; next step is to move this processing into an FSP subactor.
- always update the vlm chart last y-axis sticky
- set call `.default_view()` just before inf sleep on startup
- the chart's uppx (units-per-pixel) is > 4 (i.e. zoomed out a lot)
- don't shift the chart (to keep the most recent step in view) if the
last datum isn't in view (aka the user is probably looking at history)
The graphics update loop is much easier to grok when all the UI
components which potentially need to be updated on a cycle are arranged
together in a high-level composite namespace, thus this new
`DisplayState` addition. Create and set this state on each
`LinkedSplits` chart set and add a new method `.graphics_cycle()` which
let's a caller trigger a graphics loop update manually. Use this method
in the fsp graphics manager such that a chain can update new history
output even if there is no real-time feed driving the display loop (eg.
when a market is "closed").
Since moving to a "god loop" for graphics, we don't really need to have
a dedicated task for updating graphics on new sample increments. The
only UX difference will be that curves won't be updated until an actual new
rt-quote-event triggers the graphics loop -> so we'll have the chart
"jump" to a new position and new curve segments generated only when new
data arrives. This is imo fine since it's just less "idle" updates
where the chart would sit printing the same (last) value every step.
Instead only update the view increment if a new index is detected by
reading shm.
If we ever want this dedicated task update again this commit can be
easily reverted B)